Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 免费的黄色视频网站在线观看 | 爽 好多水 快 深点少妇免费 | 亚洲精品无码毛片久道具明星 | 寡妇高潮一级毛片免费我的闺 | 蜜桃一区二区在线视频 | 熟妇高潮精品一区二区三区下载 | 无码国产精品一区二区免费式冫忍 | 精品成人无码一区二区久 | 人人妻人人澡人人dvd | 116少妇做爰毛片 | 91精品人妻一区二区三区中文字幕 | 免费 无码 欧美精品 | 精品人妻一区二区三区线国色天香 | 4K岛国HEYZO首页 | 精品久久久久久无码人妻热桃花 | 特级西西444WWW高清大视频 | 99国产婷婷综合在线视频 | 樱桃免费人成网站www | 红桃视频在线观看黄色成人 | 性一交一黄一片一区二区男女 | 成人 拔 拔18网站在线观看 | 国产人妻人伦精品九色 | 国产欧美一区二区三区白浆喷水 | 国产成人精品久久二区二区 | 国产伦精品一区二区三区视频痴汉 | 欧产 日产 国产精品99 | 91做a爱在线观看 | 97人妻人人揉人人澡人人下载 | 国产高清在线观看无码 | 91麻豆精品国产综合久久久 剧情介绍 | 午夜一级毛片一级A片一级AⅤ人 | 久久av高潮av无码av剃毛 | 狠狠cao日日穞夜夜穞 | 一区二区三区无码按摩精电影 | 国精品人妻无码一区二区三区喝尿 | 美女性感黄色免费网站 | 女人高潮天天躁夜夜躁 | 97精品久久久久久久 | 99久久国产综合精麻豆六十路 | 亚洲精品一区中文字幕乱码 |